November 18, 2018 by piglet 0 Comments

Play Arquitectura interview in PAIS

The paper edition of the national newspaper El PAIS on Sunday, November 18, 2018, publishes an interview with Play Arquitectura in a special issue dedicated to Passivhaus, the content of which is as follows:

PlayArchitecture SL is an architectural, urban planning and engineering services company that has been committed to the Passivhaus standard since 2010.  

Why did you choose the Passivhaus standard?

The Passivhaus standard fits with our sustainable vision of architecture and we consider that It is revolutionary since he gets the better comfort, an interior environment healthier and the greater energy efficiency currently available. Therefore, the 90% of the projects from the study are designed Passivhaus and our entire team is trained in the Passivhaus standard and in Ecodesign.

What experience do you have with the Passivhaus standard?

Play Arquitectura has designed and directed the first public building of the State for the Ministry of Finance under standard Passivhaus and BREEAM as a pilot project in Sustainability and Energy Efficiency. In 2015, the company designed and managed the first certified Passivhaus public building in Spain and we are currently working on Passivhaus projects in La Rioja, Navarra, Vitoria, Lleida, Málaga and Mallorca with a combined surface area of more than 10,000 m2.

November 17, 2018 by piglet 0 Comments

The framework in Pomona has begun

On September 10, 2018, work began on assembling the light wooden framework of the Pomona House in Ivars d'Urgell.

The manufacturing and assembly work on the light wooden framework designed to meet the Passivhaus standard is being carried out by the company JESFER, specialized in this type of construction.

Within a month, the entire wooden framework, roof and carpentry will be assembled, leaving only the partition work, interior installations and cladding pending.

November 17, 2018 by piglet 0 Comments

Play Architecture at CIBSE Sheffield

Holland's bigger Bridge is currently under construction and will be ready for students Fall 2017.

×
Skip to content